Search results (2,763)

Page 28 of 277

Did you mean banbury's s s s?

Web results

New marine surface humidity climate monitoring product

., Wigley, T. M. L., Lanzante, J. R., Solomon, S., Free, M., Gleckler, P. J., Jones, P. D., Karl, T. R., Klein, S. A., Mears, C., Nychka, D., Schmidt, G. A., Sherwood, S. C. and Wentz, F. J.: Consistency of modelled and observed temperature trends in the tropical troposphere. Int. J. Climatol., 28

caa_verification_202406-june.pdf

operators. Performance measure: ≤ 2.85m/s for Wind and ≤ 0.56K for Temperature (based on 12-month mean values) Root Mean Square Vector Error 4.00 3.80 3.60 3.40 3.20 3.00 2.80 Northern Hemisphere T+24 Wind (m/s) at 250hPa Monthly Rolling 12-month mean Target Latest value: 2.95 m/s Root Mean Square Error

caa-verification-report-may-2024.pdf

operators. Performance measure: ≤ 2.85m/s for Wind and ≤ 0.56K for Temperature (based on 12-month mean values) Root Mean Square Vector Error 4.00 3.80 3.60 3.40 3.20 3.00 2.80 Northern Hemisphere T+24 Wind (m/s) at 250hPa Monthly Rolling 12-month mean Target Latest value: 2.95 m/s Root Mean Square Error

caa_verification_202412-december-24.pdf

operators. Performance measure: ≤ 2.85m/s for Wind and ≤ 0.56K for Temperature (based on 12-month mean values) Root Mean Square Vector Error 4.00 3.80 3.60 3.40 3.20 3.00 2.80 Northern Hemisphere T+24 Wind (m/s) at 250hPa Monthly Rolling 12-month mean Target Latest value: 2.92 m/s Root Mean Square

caa_verification_202407-july.pdf

operators. Performance measure: ≤ 2.85m/s for Wind and ≤ 0.56K for Temperature (based on 12-month mean values) Root Mean Square Vector Error 4.00 3.80 3.60 3.40 3.20 3.00 2.80 Northern Hemisphere T+24 Wind (m/s) at 250hPa Monthly Rolling 12-month mean Target Latest value: 2.94 m/s Root Mean Square Error

Emma Corrigan MSc, NATS Operations manager

and customer requirements, aimed at mitigating against disruptive weather events. Emma was promoted again in 2017, becoming Met Office NATS Operations manager. External recognition Emma obtained a Qualification and Credit Framework (QCF) Level 5 Diploma in Meteorological Forecasting in 2012. She also holds the World Meteorological Organization (WMO)’s Aeronautical Meteorological Forecasters (AMF) accreditation.

Disc Log 185

an entirely separate building. A professional market rental valuation of the space has not been undertaken and is not required. The Union Office is included within the overall Business Rates assessment for Met Office HQ. Information concerning Business Rates is publically available via www.voa.gov.uk. 2. Cost estimated as standard office overheads for 0.75 fte staff member plus travel for staff case visits & H&S related meetings (less than £1k per annum).

ukcp18-how-to-choose-the-most-appropriate-projection.pdf

How to choose the most appropriate land projection New to climate projections? Looking for headline messages? Carrying out detailed analysis? See What do you want to do? on UKCP18 website See Key results on UKCP18 website Select strand(s) of land projections based on task Task Probabilistic Global

Radar systems

network was built up over a period from the mid 1970's to the 1990s, with the oldest radar at Hameldon Hill. To combat the risk of obsolescence, meet the future demands of higher resolution NWP, and operationally realise the benefits of dual polarisation technology on the UK network, the radar

DePreSys: Met Office decadal prediction system

the decade. Updated decadal forecasts, along with verification of previous forecasts, are available from the Forecast web page. References Smith, D. M., S. Cusack, A. W. Colman, C. K. Folland, G. R. Harris and J. M. Murphy, 2007, Improved surface temperature prediction for the coming decade from

Page navigation