Search results (2,910)

Page 75 of 291

Web results

Title of Presentation

compares actual HI Jmaps to model Jmaps, rejecting (model) ensemble members disagreeing most with observations � more realistic ensemble spread • Can also highlight discrepancies between modelled CME and observed CME front � potential for forecasters to correct forecast, or at least estimate the sign

planning-direction-2016-wales.pdf

for the development in question together with copies of any submitted plans showing the location with a Grid Reference (to at least 6 figures each of Eastings and Northings) and the elevation of the site (to an accuracy of 0.25 meters above Ordnance Datum), together with particulars of the layout

News

2023 was second warmest year on record for UK

for at least 2 million years. The five warmest years in the UK series from 1884 include 2022, 2023, and 2020 and the ten warmest years have all occurred since 2003. 2023’s provisional mean temperature of 9.97°C puts it just behind 2022’s figure of 10.03°C and ahead of 2014’s 9.88°C. 2023 was also

wiser0068-stakeholder-consultative-workshop-report-0518.pdf

.................................................................................................... 36 Annex 2: Participants List ................................................................................................................... 38 2 Acronyms ACMAD African Centre of Meteorological Applications

Planning Circular 2 2003 - Scottish Planning Series Safeguarding of Aerodromes, Technical Sites, Meteorological Technical Sites, and Military Explosives Storage Areas: The Town and Country Planning (Safeguarded Aerodromes, Technical Sites, Meteorological Technical Sites and Military Explosives Stor

of consultation under this Direction the planning authority must provide the consultee with – (a) a copy of the application for planning permission for the development in question together with – (i) copies of any submitted plans showing the location with a Grid Reference (to at least 6 figures each

wiser0106_sahel-forecasting-applications-report.pdf

the Central Statistical Agency, National Meteorological Supported by: Fund Manager: Agency, Ministry of Agriculture and Rural Development, Early Warning Response Directorate, Livelihoods Integration Unit, World Food Programme, EU Joint Research Centre and Famine Early Warning Systems Network (Bastagli

climate-risk-report-for-csa---v10-final.pdf

salinisation. Climate change could also have positive impacts on crop yields and pasture/rangeland productivity in some rainfed and irrigated areas less affected by soil-water degradation, at least until the 2050s (3.1.2). Specifically, areas that either have moderate summers or grow several crops

arrcc_carissa_ws4_future_rainfall-v2.pdf

has been produced in partnership with the Met Office, the International Centre for Integrated Mountain Development (ICIMOD) and the Nepal Development Research Institute (NDRI) as part of the UK Aid funded Asia Regional Resilience to a Changing Climate (ARRCC) programme. The study was conducted under

annual_report_2022.pdf

projections. The new core computational models we are developing will allow a greater use of ensembles (a technique to assess multiple scenarios) to deliver more robust and usable forecasts. As we have refined the customer-centric anchor of our strategy, we have recognised the importance, over

Microsoft Word - use and interpretation of worst case scenarios final

if’ scenarios for national risk planning and accounting for sudden extreme changes in headroom. The Supplementary Green Book Guidance on accounting for climate change in public investments (Defra, 2024) specifies that, beyond 2035, it is necessary to use at least two climate scenarios – one consistent

Page navigation